1-800-STRIPER | Sealcoating near Bellevue, WA

BLOG

Sealcoating near Bellevue, WA

Oct 19, 2025   |   1-800-Striper Bellevue

Sealcoating near Bellevue, WA

Protect your asphalt from rain, oxidation, and traffic. We coordinate the full sequence, surface prep, two-coat seal, cure timing, and fresh striping, so you have one schedule and one accountable team.

Request a quote for Sealcoating in Bellevue!

Phone Number: 1-800-STRIPER
Email: bellevue@1800striper.com

Sealcoating and white parking lot striping for the new Voodoo Doughnut in Downtown Bellevue, WA

Here’s some of our recent work sealcoating work in Bellevue, WA! We provided sealcoating services and parking lot striping for the new Voodoo Doughnut.

Why Sealcoat in Bellevue?

Bellevue lots face steady traffic, year-round moisture, and cool temps off Lake Washington. A quality sealcoat layer slows wear, locks out water, and keeps your site looking sharp.

  • Extends pavement life; delays costly resurfacing
  • Improves curb appeal and onsite safety/flow
  • Pairs perfectly with fresh, high-visibility striping

Our Bellevue-Specific Approach

Downtown schedules, retail access, and weather windows demand tight coordination. Recent example: we coordinated lot prep ahead of a national doughnut brand’s downtown Bellevue opening, timed sealcoat, then fresh striping after cure so the site was ready for go-live.

We plan around weekend events, commuter peaks, and forecast swings to minimize downtime for tenants and deliveries.

Our Process

  1. Surface prep: thorough cleaning, edge trimming, minor crack fill
  2. Two-coat seal: consistent coverage with PNW-rated materials
  3. Cure time: typically ~24 hours (weather-dependent)
  4. Fresh striping: crisp, compliant markings when ready

Result: a darker, protected surface and high-visibility lines that last.

Neighborhoods & Sites We Serve

We coordinate sealcoating and line striping across the Bellevue area, including:

  • Downtown Bellevue, Old Bellevue, Meydenbauer Bay
  • BelRed, Spring District, Crossroads
  • Factoria, Eastgate, Richards Road corridor
  • Lake Hills, Newport, Somerset
  • Retail centers, HOAs, office parks, schools, faith centers, light industrial

Aftercare Tips

  • Avoid tight turns from heavy vehicles on fresh sealcoat for 24–48 hours
  • Plan layout tweaks before cure to minimize downtime
  • Schedule sweeping to keep grit/debris off the surface

Sealcoating FAQ (Bellevue)

How long does it take?
Most sites: 1 day to apply, ~24 hours cure (weather-dependent), then striping. Larger lots may be phased to maintain access.

Do you handle striping?
Yes. We coordinate the full sequence, seal → cure → stripe, so you get one schedule and a clean handoff.

What about cold or rain?
We schedule around rain and low temps using local forecasts. If the weather shifts, we adjust to ensure the seal cures correctly.

Related Services & Local Resources

Get An Estimate

1-800-STRIPER® of Bellevue

Customer Reviews

COPYRIGHT © 1999-2025 | ALL RIGHTS RESERVED STRIPER INDUSTRIES, INC. | Privacy Policy Sitemap