Apr 17, 2025 | 1-800-Striper Bellevue
While asphalt is commonly used for parking lots, many commercial and industrial properties in Western Washington utilize concrete surfaces. Striping on concrete differs from asphalt due to its unique properties. It’s higher pH levels and smoother finish can affect paint adhesion, making proper preparation crucial.
Newly poured concrete needs adequate time to cure before any striping can be applied. Typically, it should cure for at least 28 days to ensure optimal strength and surface readiness. This curing period allows the concrete to reach its intended durability and reduces the risk of paint failure. (source)
Proper surface preparation is essential for successful striping on concrete:
Neglecting these steps can lead to premature paint peeling and the need for frequent re-striping.
Not all paints are suitable for concrete surfaces. For best results:
Our region’s wet climate can impact striping projects:
To extend the life of your striping:
At 1-800-STRIPER of Bellevue, we specialize in striping parking garages tailored to the unique needs of Greater Seattle and Everett, WA properties. Our team ensures proper curing, preparation, and application for long-lasting results.
Had our parking lot paved and found ourselves needing lines. Their team was fantastic from start to finish. They took the time to give great advice and listened closely to our company’s needs.
They are very responsive and complete the work in a timely fashion. I have used them for 18 years and have never had any issue with their work. Very highly recommended.
They are very easy to work with and have a highest level of attention to detail. They are very knowledgeable and passionate about parking lot striping. Their quality of work is outstanding!
COPYRIGHT © 1999-2025 | ALL RIGHTS RESERVED STRIPER INDUSTRIES, INC. | Privacy Policy | Powered by Bon's Eye Marketing