May 08, 2025 | 1-800-Striper Providence
When the roar of the crowd filled Centreville Stadium for the very first time, most people were focused on the players, the lights, and the action on the field. What they didn’t see was the behind-the-scenes hustle that made that moment possible.
In the final week before opening day, contractors, tradespeople, and professionals from across Rhode Island came together in a coordinated push to finish what would soon become the home of Rhode Island FC. Among the final touches was something essential—yet often overlooked: the parking lot layout and striping.
At 1-800-Striper of Providence, we’re no strangers to high-pressure timelines. We specialize in expert parking lot planning, layout, and execution—and when the call came to paint the newly paved south lot at Centreville Stadium in Pawtucket, we knew this was more than just another job. It was our chance to be part of Rhode Island sports history.
Opening a stadium is like launching a rocket. Every piece has to be in place, and every detail matters. In the case of Centreville Stadium, everything from electrical systems to concession stands was being finalized in the week leading up to the first match.
The south parking lot, a crucial access point for players and staff, had just been paved earlier that week. Without proper striping and layout, traffic flow and parking would be chaotic.
That’s where we came in.
This question, “How long after paving can you stripe a parking lot?” is one we hear often. Often times, our crew will stripe immediately after a parking lot is freshly paved. We are careful not to bring our heavy truck onto the fresh pavement which could damage it. Our striping machines are not heavy enough to cause any damage to the fresh pavement.
In Pawtucket, conditions were perfect. The paving crew wrapped up earlier in the week, and by Thursday evening, the lot was complete and painted.
This kind of timing only works when every trade on-site is communicating, collaborating, and committed to a shared deadline.
In the case of new construction, the layout is already determined by an architect. At 1-800-Striper of Providence, our goal is to closely and accurately follow the blueprint as it is laid out. Layout is the most difficult part of parking lot striping, and we are experts in bringing blueprints to reality.
So what are the considerations for a parking lot layout?
Site Assessment – Analyze drainage, slope, access points, and dimensions.
Traffic Flow Planning – Use traffic engineering to avoid bottlenecks.
ADA Compliance – Make sure accessible parking meets both state and federal guidelines.
Striping Strategy – Calculate the most efficient use of space without sacrificing safety.
Execution – Use high-performance paint and precise equipment to apply crisp, long-lasting lines.
Our work at Centreville Stadium showcased this approach perfectly.
The beauty of a project like Centreville isn’t just in the work itself—it’s in the collaboration. Electricians were installing lights. Landscapers were planting trees. Signage crews were setting up directional systems. And while they were doing their work, we were right there beside them.
This wasn’t a solo job. This was a team effort. Every trade brought their best, and together, we turned a construction site into a fully operational stadium, just in time. shine.
So how long did it take us to layout and stripe the parking lot? Everything was done it one day.
Your parking lot is the first impression visitors get. A well-designed lot can improve traffic flow, enhance safety, and make your entire property feel more professional.
At 1-800-Striper of Providence, we believe that every lot—big or small—deserves the same level of care we brought to Centreville Stadium.
Whether you’re managing a stadium, retail plaza, school, or medical facility, our team is ready to turn your parking area into a polished, high-functioning asset. We’re not just painting lines. We’re shaping experiences.
We take pride in being Rhode Island’s leading provider of line striping and layout services. Our team combines precision, professionalism, and a deep understanding of what makes parking lots function smoothly.
Centreville Stadium was a proud moment for us—not just because we got the job done, but because we helped launch something bigger than ourselves. It’s a feeling we bring to every project, whether we’re painting a small retail lot or a 10,000-seat stadium.
As fans continue to pour into Centreville Stadium, we know that our lines will guide them, safely and efficiently. We’re proud of our role in that success—and we’re ready to bring the same expertise to your next project.
Contact 1-800-Striper of Providence today and let’s talk about how we can bring the finishing touches to your property—just like we did for Rhode Island FC.
Had our parking lot paved and found ourselves needing lines. Their team was fantastic from start to finish. They took the time to give great advice and listened closely to our company’s needs.
They are very responsive and complete the work in a timely fashion. I have used them for 18 years and have never had any issue with their work. Very highly recommended.
They are very easy to work with and have a highest level of attention to detail. They are very knowledgeable and passionate about parking lot striping. Their quality of work is outstanding!
COPYRIGHT © 1999-2025 | ALL RIGHTS RESERVED STRIPER INDUSTRIES, INC. | Privacy Policy | Powered by Bon's Eye Marketing